CES, treats Misawa’s drinking water
Katsuhiko Baba, 35th Civil Engineer Squadron water reservoir plant operator, checks the plant’s secondary water pump system Jan.20 at the main base water storage area. The main base water storage area is a water reservoir that contains approximately 500,000 gallons of potable water. (U.S. Air Force photo/Staff Sgt. Phillip Butterfield)