News Search

  • Runway construction paves way for flight

    After nearly three weeks of construction, Misawa Air Base’s runway became fully operational Aug. 5. Due to the high volume of aircraft using the runway, the west section’s pavement surface was highly degraded resulting in the need for a repair. The 3,840 cubic meters of asphalt laid on the